Click here to make tpub.com your Home Page

Page Title: Chapter 4. ORGANIZATIONAL MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Chapter 3. OPERATOR MAINTENANCE INSTRUCTIONS
Up
TM-5-6130-301-13-P Battery Charger Distribution Panel (MIL-P-52457) Manual
Next
Section IV. TROUBLESHOOTING PROCEDURE



TM5-6130-301-13&P
ORGANIZATIONAL MAINTENANCE
Section I. REPAIR PARTS, SPECIAL TOOLS, TMDE
A N D SUPPORT REPAIR
4-1. GENERAL. This section contains information on the repair parts, tools, and equipment issued to the
operator and organizational maintenance personnel for operating and maintaining the battery charging
Distribution Panel. Tools and equipment should not be used for purposes other than prescribed and when not in
use, should be properly stored.
4-2. REPAIR PARTS. Repair parts are listed in Appendix C of this manual.
4-3. AUTHORIZED COMMON TOOLS AND EQUIPMENT. Refer to the Modified Table of Organization and
Equipment (MTOE) applicable to your unit for Common Tools and Equipment.
4-4. SPECIAL TOOLS AND EQUIPMENT. Special Tools required to perform organizational maintenance on
the battery charging distribution panel are listed in (MAC) Maintenance Allocation Chart Section II. No other
special tools and equipment are required.
Section II. SERVICE UPON RECEIPT
4-5. INSPECTION.
a. Check the Battery Charger Distribution Panel data plate for positive identilcation.
b. Make a complete visual inspection of the exterior for evidence of damage which may have occured during
shipment.
c. Back out screws and lift panel exposing the components and check for loose wires or components.
4.6 INSTALLATION INSTRUCTIONS. The Battery Charger Distribution Panel installation size should be as
level as possible and should provide adequate ventilation.
4-7. INSTALLATION OF SEPARATELY PACKED COMPONENTS. There are no separately packed
components.
S e c t i o n III. ORGANIZATIONAL PREVENTIVE MAINTENANCE
C H E C K S AND SERVICES
4-8. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS). No PMCS is required. Refer to
paragraphs 2-2 and 2-3 for operator Preventive Maintenance Checks and Services.


Privacy Statement - Press Release - Copyright Information. - Contact Us