| ||||||||||
|
|
![]() ![]() TM5-6130-301-13&P
ORGANIZATIONAL MAINTENANCE
Section I. REPAIR PARTS, SPECIAL TOOLS, TMDE
A N D SUPPORT REPAIR
4-1. GENERAL. This section contains information on the repair parts, tools, and equipment issued to the
operator and organizational maintenance personnel for operating and maintaining the battery charging
Distribution Panel. Tools and equipment should not be used for purposes other than prescribed and when not in
use, should be properly stored.
Equipment (MTOE) applicable to your unit for Common Tools and Equipment.
the battery charging distribution panel are listed in (MAC) Maintenance Allocation Chart Section II. No other
special tools and equipment are required.
Section II. SERVICE UPON RECEIPT
4-5. INSPECTION.
a. Check the Battery Charger Distribution Panel data plate for positive identilcation.
b. Make a complete visual inspection of the exterior for evidence of damage which may have occured during
shipment.
c. Back out screws and lift panel exposing the components and check for loose wires or components.
4.6 INSTALLATION INSTRUCTIONS. The Battery Charger Distribution Panel installation size should be as
level as possible and should provide adequate ventilation.
components.
S e c t i o n III. ORGANIZATIONAL PREVENTIVE MAINTENANCE
C H E C K S AND SERVICES
4-8. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS). No PMCS is required. Refer to
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |