Click here to make tpub.com your Home Page

Page Title: BATTERY CHARGING OPERATION (Lead-acid, 12-volts dc).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
BATTERY CHARGING OPERATION (Lead-acid, 24 volts dc). - continued
Up
TM-5-6130-301-13-P Battery Charger Distribution Panel (MIL-P-52457) Manual
Next
BATTERY CHARGING OPERATION (12-Volt Batteries)



TM5-6130-301-13&P
c . Select one of the. battery charging cables (Figure 1-2) for use on connecting battery to distribution panel.
d. Connect red alligator clip on end of battery charging cable to positive (+) battery terminal, and then
connect the black alligator clip to negative (-) battery terminal.
e. Insert polarized connector of battery charging cable into the selected polarized receptacle connector and
twist connector clockwise to securely lock in position.
NOTE
If the distribution panel is not already in service, it will be necessary
to place the POWER ON/OFF Switch (20, Figure 2-1) in ON position
to apply operating power. While the distribution panel is in
continuous service, additional batteries may be connected to or
disconnected from the distribution panel with the POWER ON/OFF
Switch in ON position.
f. Set CONTROLLED CHARGING STATION SELECTOR Switch (21, Figure 2-1) to STA 1 or STA 4
position, according to which controlled 12 VOLTS station is selected (paragraph 2-8.a.).
NEVER connect or disconnect the battery charging cable connector
while a circuit breaker switch is in the ON position.
g. Press through plastic cover and set circuit breaker switch for the selected 12 VOLTS station to ON
position. If circuit breaker stitch trips to OFF position, disconnect battery charging cable and battery
connections. The distribution panel cannot be used to charge the battery because of dead or shorted cells.
h. When circuit breaker switch is set and remains in the ON position (paragraph 2-8g above), the battery is
taking a normal charge. Proceed as follows.
i. Record the time, then check the battery again in one or two minutes to make sure there is no hard boiling of
electrolyte.
NOTE
Hard boiling is indicated by big bubbles rapidly rising to the surface
of the electrolyte, causing violent agitation of the liquid.
j. If the circuit breaker is still holding, turn the current control (2 or 7, Figure 2-1) clockwise until the
ammeter (5) indicates approximately 7.5 amperes. Record the time.
k. When soft boiling is noted in the battery (2 to 4 minutes), turn the current control counterclockwise for a
current indication of approximately 5 amperes, and again record the time.
1. When soft boiling is again observed (usually 5 to 10 minutes), turn the current control counterclockwise for a
current indication of approximately 2.5 amperes, and again record the time.
m. Continue to charge the battery on the chosen 12-volt controlled station for the time period previously
determined in accordance with the instructions set forth in paragraph 2-4a.
2-9


Privacy Statement - Press Release - Copyright Information. - Contact Us