Click here to make tpub.com your Home Page

Page Title: Meter Replacement
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Chapter 4: FUNCTIONING AND TROUBLESHOOTING
Up
TM-11-6625-823-15 Test Set Battery AN/PSM-13 Manual
Next
Figure 4-1. Schematic diagram.



TM
11-6625-823-15
Item
No.
Probable trouble
Checks and corrective measures
Trouble symptom
4-------------- High meter reading on one sec-  Adapter connector defective------- Replace adapter connector.
tion of one adapter connector.
6------------ Erratic meter readings -------- a. Defective meter -----------  a. Replace meter (para 4-5).
b. Poor contacts in selector  b. Replace TS-1301/PSM-l3.
c. Clean, straighten, and inspect all
switch.
connection
c. Poor contact between adapt-
er connector and TS-
1301/PSM-13 main body,
or battery being tested.
c. Be sure that the new meter has a gasket
4-5. Meter Replacement
on it before proceeding. The gasket is keyed to
a. Remove the four meter mounting screws,
the meter body.
and invert the TS-1301/PSM-13 so that the
d. Solder the red wire to the left hand ( + )
meter falls into the hand. If gasket adhesion
terminal of a new meter.
holds the meter in place, two long taper wood
screws may be bound into the opposite mount-
e. Solder the black wire to the other ter-
ing holes of the meter; then pull out the meter
minal.
by these screws.
f. Remount the meter and tighten the comer
mounting screws.
b. Unsolder the meter wires.
NOTE
If the replacement meter does
n o t have a 0 to 10 division
s c a l e , a decal must be affixed
to its face, as shown in
4-2
Change 4


Privacy Statement - Press Release - Copyright Information. - Contact Us