| ||||||||||
|
|
![]() ![]() TM 11-6625-2631-14
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
NOTE
T h e operator will perform organizational
m a i n t e n a n c e . All test set repairs will be
r e f e r r e d to general support maintenance.
Section I. REPAINTING AND REFINISHING INSTRUCTIONS
dirt from the case with a cloth dampened (not wet)
w i t h trichloroethane.
Tools, materials, and test equipment prescribed for
(3) Remove, with a brush, dust and dirt from
organizational maintenance are as follows:
cabling and connectors. Remove grease and grime
a. Lint-free cloth.
with
a
lint-free cloth moistened with
b. Trichloroethane.
trichloroethane.
c. Sandpaper, fine (Number 000).
(4) Clean meter glass with a cloth dampened
d. Small soft-bristled brush.
(not wet) with trichloroethane.
e. Tool Kit Electronic Equipment TK-101 / G.
(5) Use a soft, clean cloth to clean the front
f. Multimeter AN/ URM-105.
panel and connector block. If dirt is difficult to
rem eve, dampen the cloth with water and use a
a. Cleaning. Inspect the exterior of the test set.
mild soap, if necessary.
The exterior surfaces should be free of dust, dirt,
b. Lubrication. No lubrication is necessary.
grease, and fungus.
(1) Remove dust and loose dirt with a clean
Remove rust and corrosion from metal surfaces by
soft cloth.
lightly sanding them with fine sandpaper.. Brush
WARNING
two thin coats of paint on the bare metal to protect
T h e fumes of trichloroethane are toxic.
i t from further corrosion. Refer to SB 11-573,
P r o v i d e thorough ventilation whenever
P a i n t i n g and Preservation Supplies Available for
u s e d . DO NOT USE NEAR AN OPEN
Field Use for Electronics Command Equipment, to
FLAME. Trichloroethane is not flam-
d e t e r m i n e the paint or preservative to be used.
m a b l e , but exposure of the fumes to an
Refer to TB 746-10, Field Instructions for Painting
open flame or hot metal surface forms
a n d Preserving Electronic Equipment, for ap-
highly toxic phosgene gas.
plicable cleaning and refinishing practices.
( 2 1 ) Remove grease, fungus, and ground-in
Section II. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
operation has ceased. Stop operation immediately if
4-4. General
a deficiency is noted during operation which would
To insure that the TS-2530 / UR is always ready
d a m a g e the equipment. Record all deficiencies
for operation, it must be inspected systematically so
together with the corrective action taken.
that defects may be discovered and corrected before
t h e y result in serious damage or failure. The
n e c e s s a r y preventive maintenance checks and
Service
services to be performed are listed and described in
Preventive maintenance checks and services of the
test set are required daily. A daily period is defined
the sequence of and minimum. inspection required.
a s 8 hours of equipment operation. Table 4-1
defects discovered during operation of the unit will
s p e c i f i e s cheeks and services that must be per-
be noted for future correction to be made as soon as
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |