Click here to make tpub.com your Home Page

Page Title: Vent Cap Valve Test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Preparing a Battery for Service Containing All New Cells
Up
TM-11-6140-203-14-4-P Nickel-Cadmium Battery BB-693A/U Manual
Next
Figure 5-7. Fabrication Diagram for Fillercap Vent Valve Tester.



TM 11-6140-203-14-4&P
minutes of the initial charge to determine if all cells are
leakage current less than 0.1 milliamperes per Ah of
uniform within 0.1 volts of the average of the  entire
battery rated capacity. (For example, the sum of the
battery.  Electrolyte level should also be  checked to
positive and negative leakage current for a 30 Ah BB-
determine if electrolyte is visible in all cells. Charge at
693AIU must be less than 3mA.) In general, however,
the C/2 rate for 3 hours (for 30Ah,
BB600A/A cells
the normal measured leakage current value should be
charge at 15A). Then lower the charging current to the
zero.
f. Final Charge If the battery has passed both the
C/5 rate (for 30 Ah,  BB600A/A cells charge at 6.0A),
continue charge until battery voltage remains constant
capacity and leakage tests, then it can be given its final
for 2 consecutive hourly readings and/or all cells are
charge in accordance with the normal procedure for the
above .1.5 volts. Do not exceed 8 hours of charging
specific charger-analyzer used. However, if the battery
time at the C5 rate.
temperature exceeds 120° F (for Permion or Celgard
(2) Pulse charging method with the AN/USM-
Separated Batteries) or
104° F (for cellophane
432 Set charger in Manual Charge Mode at a CHARGE-
separated ones) on the AN/USM-432 or the RF80GT,
allow sufficient time for the battery to cool before starting
AMPERE-HOUR setting two-thirds (2/3) of normal. For
the final  charge.  After completing the final charge,
example, with a BB693A/U battery which would normally
check all cell voltages, adjust the electrolyte level (para
be set at 30-35 use a setting of 22. After one hour of
charge, turn timer clockwise to provide a second hour.
Determine when charger goes into topping mode. With
charge in topping mode, increase CHARGE-AMPERE
5-12.  Vent Cap Valve Test
HOUR setting to the normal value and continuing in the
a. Fabricate the vent cap valve tester as shown in
topping mode for a minimum of 4 hours,  turning the
figure 5-7. (Use on old BB600/A cell or equivalent, that
charge dock back to the start position as required. Cell
has been flushed clean and is empty of electrolyte.)
voltages and electrolyte levels should be checked for
Details of the connection to the side of the cell have not
uniformity periodically, as  previously described.  For
been provided because of the wide variety of equipment
indications  of  dry cells
and/or  high  resistance
presently available in the field.
connections, the voltage change (from cell to cell) must
b. Before testing, wash the flllercap thoroughly in
be compared between the pulse ON and OFF periods
detergent and water.
(3) Reflex charging method with the RF80GT.
CAUTION
Set the charger to a current equal to the rated capacity
When using an air hose for cleaning,
of the battery (for a BB-693AIU set  current to 30
the  compressed air source must limit
amperes), switch to Reflex mode and  charge for 2
the nozzle pressure to no more than 29
hours. To complete initial formation charge, reduce the
pounds per square inch gauge (PSIG).
current to the C/2 rate (15 am peres for the 30 Ah BB-
Goggles must be worn at all times while
693A/U) and charge for an  additional 4 hours in the
cleaning with compressed air.
Reflex mode.  Notice the  Ammeter-Zeroing which is
c After washing, rinse the fillercap with clean
used to indicate full charge on the RF80GT may not
water and dry with an air blower.
occur because of the lower than normal current setting.
d. Place the fillercap to be tested on the test cell.
Full charge may be checked by switching to the constant
e. Connect the air regulator to a compressed air
current mode for 5 minutes and checking to see that all
outlet and adjust the air pressure until it builds up in the
cell  voltages are above 1.5 volts.  Cell voltages and
test cell. The fillercap vent valve should open between 2
electrolyte levels should be checked for uniformity
psi and 10 psi.
periodically as previously described. For indications of
f. If the fillercap vent valve does not open between
dry cells and/or high resistance connections, the voltage
2 psi and 10 psi, discard the fillercap. If the fillercap
change (from cell to cell) must be compared between
vent valve does open between 2 psi and 10 psi, remove
the positive and negative pulse periods.
the O-ring from the fillercap, replace with a new O-ring,
e. Performance Test. Performance testing shall be
and return the fillercap to stock for reissue.
in accordance with paragraph 5-5g.  The electrical
leakage test shall be performed following the discharge
test in paragraph 4-10 with the criteria for acceptance a
5-18


Privacy Statement - Press Release - Copyright Information. - Contact Us