Click here to make tpub.com your Home Page

Page Title: Figure 2-2. Power Transformer T1, Input Voltage Tap Connections
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-1. AN/USN-432 unpacking
Up
TM-11-6130-413-12 Battery Charger-Analyzer AN/USM-432 Manual
Next
Chapter 3: OPERATING INSTRUCTIONS



TM 11-6130-413-12
CAUTION
The ± 5% taps are factory pre-set and
should be changed only if a unit tends to
over- or under-charge. Do not change the
tap unless replacing T1.
c. Operation at 50Hz. To operate at power line
frequency of 50 Hz the timer face plates must be
reversed as follows.
(1) Remove 25 screws from the top cover of the
charger/analyzer and remove cover.
(2) Remove the three (3) timer knobs by loosen-
ing the two setscrews on each knob.
(3) Remove 7 phillips screws and nuts holding the
face plate. Hold the nuts to prevent their falling into
the charger/analyzer.
(4) Reverse the face plate and reattach using the
Figure 2-2. Power Transformer T1, Input Voltage Tap
screws and nuts removed in step (3); replace timer
Connections
knobs in original position and tighten setscrews.
d. Installation Checkout. Refer to the prelimi-
nary operation check out procedures given in sec-
tion 3 to verify that the equipment `is properly
installed and ready for operation.
Change 1
2-3


Privacy Statement - Press Release - Copyright Information. - Contact Us