Click here to make tpub.com your Home Page

Page Title: Figure 4-2. Pin and Terminal Locations for Components Replaced at General Support Level (Sheet 2 of 4)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-2. Pin and Terminal Locations for Components Replaced at General Support Level (Sheet 1 of 4)
Up
TM-11-6130-392-34 Charger Battery PP-7286/U Manual
Next
Figure 4-2. Pin and Terminal Locations for Components Replacement General Support Level (Sheet 3 of 4)



TM 11-6130-392-34
Figure 4-2. Pin and Terminal Locations for Components Replaced at General Support Level (Sheet 2 of 4)
sure S6 is actuated (in down and closed position)
0.04-0.08 inch coating of red staking compound
when measurements are made.
(SM-A-852314) on S1 and on T1 terminals 1 through
5. Go to section V.
(1) If continuity is good; go to step f.
(2) If continuity is not good; replace S1 (Sec-
(2) If continuity not good; replace S6 (Section
tion IV, para 4-21), apply a 0.04-0.08 inch coating of
red staking compound (SM-A-852314) on T1 termi-
f. Peel or pick away red staking compound on
nals 1 through 5. Go to section V.
CB1 (fig. 4-1 and 4-2). Check for continuity between
e. Peel or pick away red staking compound on S6
CB1-2 and CB1-1, and between CB1-4 and CB1-3.
(fig. 4-2 and FO-1). Check for continuity between
Make sure POWER switch is in ON position for this
S6A-C to S6A-NO and between S6B-C and S6B-NO
measurement.
(only two wires each side of interlock switch). Make
(1) If continuity is good; go to step g.
4-9


Privacy Statement - Press Release - Copyright Information. - Contact Us