Click here to make tpub.com your Home Page

Page Title: Section III. TROUBLESHOOTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-1. Location of Components Replaced GS (Sheet 2 of 2)
Up
TM-11-6130-392-34 Charger Battery PP-7286/U Manual
Next
Table 4-3. Troubleshooting Test Procedures



TM 11-6130-392-34
Table 4-2. Tools and Materials
National
Use
Stock No.
Item
5180-00-610-8177
.............................................
Tool kit, Electronic Equipment TK-105/G . . . . . . . . . . .
4940-00-785-1162
Heat shrink sleeving installed over some connections . .
Heat Gun . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cover exposed terminals and allow to cure. (Curing
Staking compound, blue SM-B-739574 . . . . . . . . . . . . . .
time ­ 24 hours)
Staking compound, red SM-A-852514. . . . . . . . . . . . . . .
Cover exposed terminals and allow to cure. (Curing
time ­ 24 hours)
6130-01-066-4496
Special, fault isolation of charging modules (A6 through
Extender board, testing (23 pin) SM-D-889125. . . . . . . .
A10) and power supply assembly (A11)
6130-01-066-4495
Extender board, testing (41 pin) SM-D-889122. . . . . . . .
Special, fault isolation of timing circuit assembly
(A12)
Section III. TROUBLESHOOTING
4-9. Use of Equipment and Special
4-7.
Troubleshooting-General
Tools
This section contains instructions for trouble-
a. Refer to direct support maintenance, Chapter
shooting the Battery Charger PP-7286/U. General
3, section III, paragraph 3-9.
support personnel will replace and repair compo-
b. In use of digital multimeter, and reference to
nents,  a s specifically listed in paragraph 4-3.
settings in text, F = Function, R = Range. For con-
Replacement and repair procedures are included in
tinuity checks, set Function to Ω (ohms) and Range
Section IV. Test procedures for GS use, after replac-
to 200(ohms). Reading should be less than 0.2
ing or repairing a component, are included in Sec-
ohms.
tion V. Figure FO-1 is a schematic diagram of the
battery charger.
4 - 1 0 . Bat t e r y C h a r g e r , P r e p a r a t i o n
for Testing
4-8. Troubleshooting Test Sequence
Refer to direct support maintenance, Chapter 3, sec-
tion III, paragraph 3-10.
a. Visual inspection. Before performing tests,
visually inspect the battery charger to find faults
4-11. Troubleshooting Test Procedure
that experienced and trained GS personnel usually
a. Perform test procedures as shown in table 4-3,
find.
in the sequence listed in column 1 to troubleshoot
b. Test sequence. The test sequence for trouble-
Battery Charger PP-7286/U.
shooting the battery charger and isolating faulty
b. From a malfunction indication in column 2,
components, is:
follow instruction or reference in column 3 to isolate
( 1 ) Perform the troubleshooting test proce-
faults and make required corrections.
dures listed in table 4-3.
NOTE
(2) Perform fault isolation test procedures con-
When a column 3 instruction in table 4-3 re-
tained in paragraph 4-12, when required by a table
quires finding and correcting an open cir-
4-3 instruction.
cuit; resoldering or replacing a wire lead is
(3) Test the battery charger, after replacing or
a general repair authorized and to be per-
repairing a faulty component, by using test proce-
formed by GS personnel.
dure listed in Section V.
c. Test point locations.
CAUTION
If meter needle pegs during any step of
(1) Refer to direct support maintenance
following table, quickly set POWER switch
Chapter 3, section III.
to OFF and perform instruction in column 3
(2) Additional illustrations are provided and
of step (4).
referenced in text.
4-4


Privacy Statement - Press Release - Copyright Information. - Contact Us