Click here to make tpub.com your Home Page

Page Title: Chapter 5. INSTALLATION PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 4-2. Non-Kit Parts List for Installation of C4ISR Equipment - continued
Up
TB-9-2320-280-35-9 Installation Instructions for Vehicle With Soft Top Manual
Next
INTEGRATED RACK ­ A3276903 ­ QTY. 1



TB 9-2320-280-35-9
INSTALLATION PROCEDURES
Section I. SCOPE
This chapter provides instructions for installation of C4ISR items in the vehicle. When installing C4ISR
equipment, be sure to read and follow instructions and illustrations carefully.
Section II. INTEGRATED RACK INSTALLATION
2-1. Remove two inserts (2) from bottom of integrated rack (1).
2
1
1. INTEGRATED RACK ­ A3276903 ­ QTY. 1
Figure 5-1.
2-2. Using integrated rack (1) as template, locate, mark, and drill three 0.390-in. diameter holes (4) in
dash (6).
2-3. Remove paint from vicinity of holes (4) and two existing inserts (5).
2-4. Install insert (3) and inserts (5) in holes (4).
2-5. Apply anti-seize compound to vicinity of inserts (3) and (5) as required.
5
4
6
3
3. INSERT ­ 12446871-2 ­ QTY. 1
Figure 5-2.


Privacy Statement - Press Release - Copyright Information. - Contact Us