Click here to make tpub.com your Home Page

Page Title: Section II. BATTERY BOX PREPARATIONS -continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section II. BATTERY BOX PREPARATIONS - continued
Up
TB-9-2320-280-35-12 Installation Instructions for EPLRS Network Manager Vehicle with AMTECH Top Manual
Next
Section II. BATTERY BOX PREPARATIONS - continued



TB 9-2320-280-35-12
2-12. Using terminal strips (16) and (13) as templates locate, mark, and drill eight 0.201-in. diameter
holes (20) in battery box (2) rear wall.
2-13. Secure one 8-position terminal strip (13) and one 6-position terminal strip (16) to battery box (2)
rear wall with eight bolts (14), washers (15), lockwashers (17), and nuts (18).
2-14. Using shunt assembly (19) as template, locate, mark, and drill two .201-in. diameter holes (21) in
battery box (2) rear wall.
2-15. Secure shunt assembly (19) to battery box (2) rear wall with two bolts (14), two washers (15),
two lockwashers (17), and two nuts (18).
16
17
18
1.66
1.00
4.25
1.66
20
15
2.25
1.125
14
21
19
18
15
~
14
13
17
2
13.
TERMINAL STRIP (8-POLE) ­ 7527K28 ­ QTY. 1
14.
SCREW ­ MS35207-267 ­ QTY. 10
15.
WASHER ­ MS27183-8 ­ QTY. 10
16.
TERMINAL STRIP (6-POLE) ­ 7527K26 ­ QTY. 1
17.
LOCKWASHER ­ MS45904-60 ­ QTY. 10
18.
NUT ­ MS35650-302 ­ QTY. 10
19.
SHUNT ASSEMBLY ­ PKMM-000-013 ­ QTY. 1
Figure 5-6.
5-5


Privacy Statement - Press Release - Copyright Information. - Contact Us