Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION OF AUTOMATIC PARACHUTE RIPCORD RELEASE ASSEMBLY
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
Figure 3-17.—Inspecting firing lanyard
Up
Aircrew Survival Equipmentman 2 - Aviation theories and other practices
Next
Figure  3-24.-Installing  retaining  bands

Figure  3-20.—Lanyard  tacking. Slowly remove the Type I line from the firing lanyard  bight.  Rapid  removal  of  the  Type  I  line from  a  firing  lanyard  bight  could  damage  the lanyard. Form and stow an 8-inch bight of firing lanyard in the remaining stowage sleeve channel in  the  same  manner.  Tack  the  second  lanyard bight to the stowage sleeve with one turn of waxed size A nylon thread, single. Tie the ends with a surgeon’s  knot  followed  by  a  square  knot  (fig. 3-20). Insert  the  stowage  sleeve  into  the  extractor sleeve,  open  end  first  (fig.  3-21).  Engage  the fastener on the stowage sleeve to the fastener on the extractor sleeve. Engage the extractor sleeve fasteners on each side of the safety pin (fig. 3-22). INSTALLATION   OF   AUTOMATIC PARACHUTE  RIPCORD  RELEASE ASSEMBLY You have read about the automatic parachute ripcord  release  in  chapter  2  of  this  manual.  At this  time,  you  will  see  how  it  is  installed  into  a container. Before you actually attempt to install a release assembly, (fig. 3-23), you must first make sure   that   the   inspection   requirements   in   the NAVAIR 13-1-6.2 and the NAVAIR 13-600-4-6-3 have  been  complied  with. Now   you   are   ready   to   proceed   with   the installation. First, rotate the risers over the suspension lines and  position  the  container  on  the  packing  table so that the bottom end is towards the canopy and 3-10 Figure 3-21.—Inserting stowage sleeve. Figure  3-22.—Engaging  snaps.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing