Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Ripcord Handle Pocket Inspection
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
BALLISTIC  SPREADING  GUN INSPECTION
Up
Aircrew Survival Equipmentman 2 - Aviation theories and other practices
Next
COMPLIANCE WITH CURRENT DIRECTIVES

edges.  Check  the  tamper-dot  on  the  locking  screw. If it is broken, tighten it and apply a new tamper- dot  to  the  screwhead  using  lacquer  (TT-L-32, 11136, insignia red) or equivalent. Remove sand or any dirt from the mechanism using an air hose to blow it out at not more than 50 psi pressure. Wipe  dirt  and  grease  from  fittings  with  a  clean rag.  Do  not  lubricate  the  fittings.  Replace  all damaged  fittings. 2.   With   the   canopy   quick-release   fitting locking  cover  plate  held  in  the  open  position, insert  a  torquemeter  into  the  hexagonal  cavity located on either end of the knurled locking-lever shaft.   With   the   canopy   quick-release   fitting locking  cover  plate  held  in  the  open  position, rotate the knurled lever shaft until it reaches the stop.  Record  the  torque  reading.  The  allowable torque is 28 to 50 ounce-inches. All canopy quick- release   fittings   that   do   not   meet   torque   test requirements  must  be  replaced. 3.  Inspect  all  other  hardware  for  signs  of corrosion,  pitting,  ease  of  operation,  security  of attachment, bends, dents, nicks, burrs and sharp edges. Make sure that the rollers in the roller yokes turn  freely.  If  you  find  any  parts  damaged, forward the riser or harness assembly to supply for  screening. NOTE: Hardware that has been rejected is forwarded to the Commanding Officer, Naval  Weapons  Center,  China  Lake. California, Attention: Code END, 4. Cross-Connector Strap Inspection Inspect  the  cross-connector  strap(s)  for  signs of contamination, cuts, fraying, burns, and loose or  broken  stitching.  If  you  find  any  damage, dispose   of   them   locally,   and   replace   them   in accordance  with  applicable  rigging  and  packing procedures. RIPCORD  ASSEMBLY  INSPECTION The  ripcord  was  inspected  before  the  para- chute  was  unpacked.  Now  it  is  inspected  again. To  inspect  the  ripcord  assembly,  examine  the following: 1.  Inspect  the  ripcord  handle.  Examine  the cable  and  locking  pins  for  signs  of  corrosion, bends,   dents,   cracks,   loose   swage   joints,   and breaks.  If  damaged,  dispose  of  it  locally. 2.  Inspect  the  ripcord  housing  for  signs  of corrosion,  bends,  dents,  and  for  security  of attachment. If any damage is found, replace the housing. 3. Inspect the ripcord housing release clamp and baseplate for signs of corrosion, bends, dents, cracks  and  security  of  attachment. 4. Inspect the ripcord housing release lanyard and  guide  for  signs  of  contamination,  tears, fraying,  loose  or  broken  stitches,  cuts,  burns, correct  length  and  security  of  attachment. 5. If you find any loose or damaged tackings, they  must  be  replaced. Ripcord Handle Pocket Inspection Inspect the ripcord handle pocket for signs of contamination,  cuts,  tears,  burns,  fraying,  and loose or broken stitches. If such damage is found, the pocket is replaced. You have an option on how the new pocket can be installed. You may install a  new  pocket  by  machine  stitching,  using  nylon thread,  size  E  (V-T-295),  or  by  whip  stitching, using   waxed   nylon   6-cord,   type   I,   doubled, stitches  being  3/8-inch  apart. Ripcord  Handle  Clip  Inspection To inspect the ripcord handle clip, you should do  the  following: 1.  Examine  the  clip  for  corrosion,  sharp edges,  bends,  twists,  and  dents.  Examine  the webbing  for  contamination,  fraying,  loose  or broken  stitching,  cuts  and  burns.  Replace  any damaged  stitching.  If  other  damage  exists,  replace webbing   and/or   clip. 2.  If  any  maintenance  is  performed  on  the clip,  repeat  the  pull-force  test  outlined  in NAVAIR  13-600-4-6-3  and  described  earlier  in this  chapter. CONTAINER  ASSEMBLY  INSPECTION When  you  inspect  the  container  assembly, examine  all  flaps,  locking  cones,  and  grommets, spring   opening   bands,   and   tackings;   checking 1-29

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing