Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Cartridges and Cartridge-Actuated Devices
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
Figure 1-14.—Parachute configuration inspection and history record
Up
Aircrew Survival Equipmentman 2 - Aviation theories and other practices
Next
Figure  1-15.—Canopy  damage  chart  for  28-foot  diameter  canopy  (page  1)

parachute assembly from one activity to another, all  original  (flimsy)  copies  from  the  permanent  file are  transferred  to  the  new  custodian  to  provide a  complete  history  of  the  parachute  assembly. This  will  also  initiate  the  new  custodian’s permanent file. When a parachute assembly has been involved in an aircraft accident, the history record and the permanent file of original (flimsy) history records are forwarded to the Commander, Naval  Weapons  Center  (Code  64123),  China Lake,  CA  93555. Initiation The IMA placing the parachute assembly into service  initiates  the  Parachute  Configuration Inspection and History Record. The IMA initiates a  new  history  record  each  time  the  parachute assembly is inducted for repack or maintenance. All  required  entries  must  be  legibly  recorded, using a ball-point pen or typewriter. The Aircraft Buno/Serial  Number  block  maybe  annotated  in pencil or left blank, to be filled in by the cognizant custodian  of  the  parachute  assembly.  Entry  errors are ruled through a single line and initialed by the quality  assurance  inspector.  The  hardback  copy from  the  previous  inspection  can  be  destroyed upon acceptance of the newly repacked parachute assembly  by  the  OMA. The type parachute (NES-12, A/P28S-27), the parachute  assembly  part  number  (576AS100-27, MBEU  10030PA-4),  the  canopy  serial  number, the date the canopy was placed in service (month and  year),  the  aircraft  buno/serial  number,  the controlling custodian’s alphanumeric 3-M organi- zation   code,   the   next   scheduled   removal   date (Julian  date),  and  the  actual  removed  date  (Julian date)  must  be  entered  at  the  top  of  the  history record. Cartridges and Cartridge-Actuated Devices The parachute in the example uses a cartridge- actuated   device,   so   you   must   fill   out   the appropriate  columns  on  the  history  card.  If  the parachute does not use the devices listed, you must use   the   letters   N/A   (not   applicable)   in   the column(s).  Enter  the  part  number,  type  of cartridge  being  used,  the  time  delay  of  the cartridge, lot number, and the expiration date of the  cartridge. Technical  Directives Since   you   are   placing   the   parachute   into service, you must update its history of technical directives   with   prescribed   changes   and   modi- fications  that  were  previously  incorporated.  The codes  used  to  properly  fill  out  this  part  of  the history  card  can  be  found  in  appendix  K  of OPNAVINST  4790.2  (series).  You  also  need  to use  NAVAIR  13-1-6.2  to  find  a  listing  of  all technical directives that apply to this equipment. Miscellaneous  History If applicable, you should enter the results of the   ripcord   pin   pull   force   check   for   both disassembly  and  assembly.  Notice  the  quality assurance  inspector’s  initials  are  entered  below each  recorded  measurement.  The  inspector’s initials must also be placed in the space following the Suspension Line Mandatory Inspection Point (SLMIP).  If  applicable,  the  automatic  parachute ripcord release firing altitude and the results of the spreading gun firing pin pull force check are logged in the proper location. If these checks do not  apply,  you  should  enter  N/A.  You  should enter   the   Julian   date   of   the   last   complete inspection  and  repack,  if  applicable.  If  you  find these  actions  are  not  applicable,  enter  N/A. Indicate  whether  or  not  a  canopy  damage  chart is  attached  by  checking  the  appropriate  box. Configuration Verification (A list of each item that has a service life) All   parachute   components   other   than   car- tridges   and   cartridge-actuated   devices   with assigned   service   life   must   be   entered   in   the Configuration Verification Section of the history record.  Service  life  items  can  be  identified  by referring   to   the   Illustrated   Parts   Breakdown Numerical   Index   of   the   applicable   parachute assembly work package. Enter the nomenclature, part   number,   contract   number,   manufactured date  (month  and  year),  placed-in-service  date,  and the  expiration  date  for  each  component  with  a service life. Obtain the date of manufacture and contract  number  from  the  component  label.  The placed-in-service date is from the date the shipping container seal is broken. If the service life has been extended  for  a  particular  component,  enter  the issuing authority and the date-time group of the authorizing  message  in  the  Remarks  column.  If the  contract  number  is  not  known  or  cannot  be determined, enter UNK in the appropriate block. 1-19

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing