Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Figure 7-5.—Removing spring and spacer pins
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
ACCEPTANCE/PHASED/SDLM INSPECTIONS
Up
Aircrew Survival Equipmentman 2 - Aviation theories and other practices
Next
Table 7-2.—Troubleshooting

Figure 7-4.—Pushing actuating lever down. 3.  Remove  spring  and  two  spacer  pins.  Lift actuating  lever  assembly  with  cable  inserted  in clevis  from  housing  (fig.  7-5). 4.  Thread  approximately  5  inches  of  nylon cord,  MIL-C-5040,  through  “LINKS”  and  tie both  ends  together  (fig.  7-6). 5. Insert hook of scale into loop of nylon cord (fig.  7-7). 6.  Pull  the  scale  towards  aft  direction  of  kit and  in  the  normal  direction  of  cable  operation. Ensure the adjusting sleeve does not move from its  housing  while  pull  force  is  exerted.  Ensure  that the   links   and   clevis   are   not   pulled   from   the housing more than 1/2 inch. Swaged balls should withstand  100  pounds  pull  force  (fig.  7-8). Figure 7-5.—Removing spring and spacer pins. Figure 7-6.—Tying links together. Figure 7-7.—Attaching scale to nylon loop. Figure 7-8.—Testing swaged ball. 7-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing