Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: 14022_244
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
PRODUCTION CONTROL
Up
Aviation Maintenance Ratings - Aviation theories and other practices
Next
WORKLOAD  PRIORITY ASSIGNMENT

Figure 7-19.—Scheduled Removal Component (SRC) card (OPSAV 4790/28A). Q31.     In  the  intermediate  maintenance  activity  (IMA), what  work  center  is  responsible  for  maintaining positive  control  of  all  accountable  material? Maintaining VIDS display boards and verify that The quantity of like items in the supply department the various work center VIDS display boards are determines the priority set on the inducted item. Once in parity. If operating under NALCOMIS. ensure the IMA has the component, production control tracks work  centers  are  updating  NALCOMIS  as it and manages the priority as it goes through the repair required. cycle. Ensuring   packaging,   preservation,   and represervation  is  done  according  to  applicable technical  manuals. It  is  important  to  remember  that  production  control is the nerve center of the intermediate maintenance activity  (IMA).  The  IMAs  primary  purpose  is  to support   the   squadrons   and   to   help   the   supply department  support  the  squadrons.  When  a  local squadron is in need of a repairable aircraft component, its use of a replacement part from supply directly affects the IMA. The bad part removed from the aircraft  (retrograde  component)  will  eventually  show up   in   the   aeronautical   material   screening   unit (AMSU), and if they have the capability to repair it, that component will be inducted in the IMA. SUPPLY PRIORITIES/PROJECT CODE ASSIGNMENT When informed by the repairing work center of repair  parts  requirements.  production  control  assigns the supply priority and project code. As discussed in chapter 3, all Navy activities are assigned  a  force  activity  designator  (FAD)  for determining priorities for material support based on their   mission.   The   FAD   is   correlated   with   an urgency-of-need   requirement   to   determine   the priority assigned to requisitions. For example, a FAD 7-20

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing