Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: POLICY FOR SAFETY PROGRAM
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
INSTALLED  EXPLOSIVE  SAFETY DEVICES  (OPNAV  4790/26A)
Up
Aviation Structural Mechanic E1&C - How airplanes are built and how to maintain them
Next
CHAPTER 2 ELECTRICALLY OPERATED CANOPY SYSTEM

Navy  Ammunition  Logistic  Code  listed  in  the Navy   Ammunition   Stock   Microfiche,   TWO10- AA-ORD-010/NA  11-1-116A  (NOTAL).  DODICs are  also  specified  in  the  four  technical  manuals mentioned  in  the  details  for  block  11. Block  4—Nomenclature  or  Type  of  Device. Enter  the  name/type  device. Block 5—Lot No. Enter the lot number of the device. Block 6—Serial No. Enter the serial number of  the  device.  For  devices  not  serialized,  enter Block   7—Purpose   or   Location.   Enter   the purpose  or  the  location  of  the  device. Block  8—Installing  Activity/Date.  Enter  the short title of the activity and the month and year that   the   device   was   installed;   for   example, VA34/JUL90. Block   9—Container   Open   Date.   Enter   the month  and  year  the  container  was  opened;  for example, JUL 90. When the container open date is  not  required  for  AEPS  devices,  “NA”  will  be entered. Block  10—Date  of  Manufacture.  Enter  the date,   month,   and   year   of   manufacture;   for example, JUL 90. For CADS enter manufacture date, and for AEPS enter propellant manufacture date. Block     11—Expiration     Date.     Enter     the computed month and year; for example, JUL 90. Installed  service-life  expiration  dates  for  explosive devices   are   computed   from   the   date   of manufacture,  the  date  the  hermetically  sealed container  is  opened,  and  the  date  the  device  is installed.   The   method   used   in   computing   the expiration  date  of  explosive  devices  and  the number  of  months/years  a  specific  device  may remain   in   service   is   contained   in   NA   11- 85-1-1.2(NOTAL),   NA   11-100-1.1(NOTAL),   NA 11-100-1.2(NOTAL),  and  NA  11-100-1.3(NOTAL). When   installed   explosive   safety   devices   have extensions  granted,  the  expiration  date  will  be updated  by  drawing  a  line  through  the  old expiration  date  and  placing  the  new  expiration date   above   it.   The   authority   granting   the extension,  for  example,  message  originator  and date   time   group   (DTG   or   IRAC   number   and manual), will be logged in the Remarks Column (block   12). Block   12—Remarks.   Make   applicable remarks.  This  block  is  limited  in  size;  use  the Miscellaneous/History page if additional space is required. Block  13—Removal  Date.  Enter  the  month and  year  the  device  was  removed;  for  example, JUL  90. POLICY  FOR  SAFETY  PROGRAM Learning   Objective:  Recognize   the importance  of  training  personnel  to  fully comply   with   safety   precautions   and directives. While   no   attempt   has   been   made   in   this training  manual  to  cover  all  the  areas  of  safety responsibility   pertaining   to   the   AME   rating, enough  has  been  presented  to  stress  to  the  AME1 and  AMEC  the  importance  of  safety.  Senior AMEs  must  continually  strive  to  improve  the safety  program. The  AME  must  interpret  and  apply  safety directives   and   precautions   established   by   the Department of the Navy, type commander, local command, and the precautions required for each job.  Safety  directives  and  precautions  must  be followed  to  the  letter.  This  will  save  lives,  prevent injuries,  and  prevent  damage  to  equipment. Should  an  occasion  arise  in  which  doubt  exists about the application of a particular directive or precaution,  the  measure  to  be  taken  is  that  which will   achieve   maximum   safety.   A   shipboard operation requires more attention to safety than a   shore-based   operation.   Although,   in   most instances,  the  hazards  and  the  precautions  are the  same  whether  the  work  is  done  afloat  or ashore. 1-13 “NA.”

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing