Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CHAPTER 2 DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CHAPTER 1 INTRODUCTION
Up
TM-9-4910-663-34 Heater Immersion Liquid Fuel Fired 36 000 BTU Output for Corrugated Cans Manual
Next
Figure 2-1.  Varidrive lubrication chart, part number 7458-2

TM 9-4910-663-34 CHAPTER 2 DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS Section I.  SERVICE UPON RECEIPT OF MATERIAL 2-1.  UNPACKING AND INSPECTION a. Uncrate the test stand and set it on a solid, level floor or foundation using a suitable fork-lift through the locations provided (fig 2-2). b. Remove all barrier material from the test stand. c. Inspect the test stand for damage to the motor housing of the varidrive, the gearcase of the varidrive (90, fig 3-5, sheet 2 of 2), the blower motor assembly (fig 2-10), and all front panel switches and meters (figs 2-4, 2-5, 2-6, and 2-7). d. Check to see that all accessory interconnecting cables are in good condition and that wiring is  undamaged and secure. NOTE The    accessories    are    shipped    in    the    storage    compartment    or    in    the    rectifier    and    battery compartments. e. Inspect and tighten, as necessary, all screws, bolts, knobs, and terminals. 2-2.  SERVICING CAUTION Running  the  test  stand  without  gearcase  lubricant  can  damage  the  gearcase.    The  gearcase  is emptied before shipment and must be filled before the test stand is placed in service. Lubricate the gearcase of the varidrive as shown in the lubrication chart (fig 2-1 or 2-1.1). 2-3.  INSTALLATION a. Power Requirements. (1) A 230/460 volt, 3 Phase, 60 Hz AC power source is required for operation of the test stand.  Refer to table 2-1. Change 1  2-1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing