Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TROUBLESHOOTING (Continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
TROUBLESHOOTING (Continued)
Up
TM-9-4910-663-34 Heater Immersion Liquid Fuel Fired 36 000 BTU Output for Corrugated Cans Manual
Next
TROUBLESHOOTING (Continued)

TM 9-4910-663-34 Table 2-5.  TROUBLESHOOTING (Continued) MALFUNCTION TEST OR INSPECTION CORRECTIVE ACTION Step 26. Set circuit breaker switch CB1 to OFF position.  Disconnect leads from one coil terminal of relay K7. Using ohmmeter, check for relay K7 coil resistance between 60.3 and 70.4 ohms.  Then reconnect leads. Replace relay K7 if coil resistance is not as specified. Step 27. Set LOAD SELECTION 50 AMPS/25 AMPS switch S20 to OFF position.  Set LOAD SELECTION 100 AMPS/50 AMPS switch S19 to ON position.  With circuit breaker switch CB1 set to ON position, check for 0.285 ohm ±5% resistance indication between REGULATOR B+ and REGULATOR B- binding posts, using ohmmeter. If resistance is not as specified, proceed to step 28; if resistance is normal, proceed to step 30. Step 28. Set LOAD SELECTION 100 AMPS/50 AMPS SWITCH S19 to OFF position.  Using ohmmeter, check for 1.14 ohm ±5% indication between REGULATOR B- binding post and each of load bank terminals 9, 10, 11, and 12. If any indication is not as specified, replace load bank element. Step 29. Using ohmmeter, check for continuity across each set of contacts of LOAD SELECTION 100 AMPS/50 AMPS switch S19 with switch S19 set to ON position. If open indication is obtained for any set of switch contacts, replace switch S19. Step 30. Set LOAD SELECTION 100 AMPS/50 AMPS switch S19 to OFF position.  Set LOAD SELECTION 100 AMPS/50 AMPS switch S18 to ON position.  With circuit breaker switch CB1set to ON position, check for 0.285 ohm ±5% resistance indication between REGULATOR B+ and REGULATOR B- binding posts, using ohmmeter. If resistance indication is not as specified, proceed to step 31; if resistance indication is normal, proceed to step 33. Step 31. Set LOAD SELECTION 100 AMPS/50 AMPS switch S18 to OFF position.  Using ohmmeter, check for 1.14 ohm ±5% indication between REGULATOR B- binding post and each of load bank terminals 5, 6, 7, and 8. 2-31