Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. TROUBLESHOOTING
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-3.  Link board assembly connections
Up
TM-9-4910-663-34 Heater Immersion Liquid Fuel Fired 36 000 BTU Output for Corrugated Cans Manual
Next
Subject

TM 9-4910-663-34 2-4. EQUIPMENT CHECKOUT a. Check the zero setting of all front panel meters, per paragraph 2.3.c of TM 9-4910-663-12. b. Turn on the external power source, set the main circuit breaker switch in the high voltage compartment to the on position (CB1, fig 2-8), and check to see that the test stand operates.  A reversing switch is provided in the drive motor circuit for reversing drive motor rotation as necessary.  With an input A-B-C phase sequence, setting the reversing switch to the down position will cause clockwise rotation of the output shafts as viewed facing the output shafts. Section II.  PRE-EMBARKATION INSPECTION OF MATERIAL IN UNITS ALERTED FOR OVERSEAS MOVEMENT 2-5.  Not applicable. Section III.  TROUBLESHOOTING 2-6.  INTRODUCTION a. This section contains troubleshooting information for locating and correcting most of the operating troubles which may develop in the test stand.  Each malfunction for an individual section of the test stand is followed by a list of tests or inspections   which   will   help   you   to   determine   the   corrective   actions   for   you   to   take.      You   should   perform   the tests/inspections and corrective actions in the order listed. b. This  manual  cannot  list  all  possible  malfunctions  that  may  occur,  nor  all  tests  or  inspections  and  corrective actions.  If a malfunction is not listed (except when the malfunction and cause are obvious) or is not corrected by listed corrective actions, notify your supervisor. 2-7.  PRELIMINARY CONTROL SETTINGS.  Before proceeding with troubleshooting, set the operating controls of the test stand to the positions listed in table 2-2. 2-8.  USE OF TROUBLESHOOTING TABLE a. Troubleshooting information is contained in table 2-5.  To minimize unnecessary repetition of information in the table, troubleshooting information is arranged in a logical sequence.  For any malfunction listed in the table, the tests and corrective actions listed are based on the assumption that none of the preceding malfunctions exists; therefore, make sure  that  none  of  the  preceding  malfunctions  listed  in  the  table  are  present.    For  direct  reference  to  troubleshooting procedures by subject, the following alphabetical list is provided: Change 1  2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing