SECURING EQUIPMENT
Up
TM-9-2510-247-13-P Fifth Wheel Towing Device Model 250M (NSN 2510-01-458-8253) Manual
Next
OPERATE LIGHTS

TM 9-2510-247-13&P
0014 00
SECURING EQUIPMENT - Continued
4. If safety chain is through D-ring (7), secure with load binder (9) as shown.
Figure 55. Tie Down - Example #1
5. If safety chain is through tiedown bracket (8), secure with load binder (9) over top of winch
cable (10) as shown.
Figure 56. Tie Down - Example #2
NOTE
After completion of tiedown procedures, refer to WP 0010, steps 23 through 28,
to complete the loading procedures.
END OF WORK PACKAGE