Click here to make tpub.com your Home Page

Page Title: PREPARING EQUIPMENT FOR TOWING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 52. Winch Free Spool Lever
Up
TM-9-2510-247-13-P Fifth Wheel Towing Device Model 250M (NSN 2510-01-458-8253) Manual
Next
SECURING EQUIPMENT

TM 9-2510-247-13&P
PREPARING EQUIPMENT FOR TOWING
WARNING
Secure any materials or equipment loaded in the beds of towed equipment.
Failure to comply may result in death or injury to personnel.
When loaded, shut down towed equipment, turn off all switches, close
doors and hatches, and swing in mirrors. Failure to comply may result in
death or injury to personnel.
NOTE
Reduce towed equipment to lowest height configuration consistent with the
operational requirements.
Reference towed vehicle TM for drive train disconnect requirements.
1. Set parking brakes on prime mover and towed vehicle.
2. Follow instructions for loading equipment (WP 0010) prior to securing towed vehicle.
NOTE
Prior to transporting towed vehicle, ensure parking brakes and wheel chocks
are released.
END OF WORK PACKAGE
0013 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us