Click here to make tpub.com your Home Page

Page Title: Figure 42. Tow Bar Assembly Preparation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
PREPARE TOW BAR ASSEMBLIES
Up
TM-9-2510-247-13-P Fifth Wheel Towing Device Model 250M (NSN 2510-01-458-8253) Manual
Next
CONNECTING TO TOWED VEHICLE

TM 9-2510-247-13&P
0009 00
PREPARE TOW BAR ASSEMBLIES - Continued
WARNING
When tilting towbar assembly, upper section is not secure and may fall out and
cause personal injury or death.
3. Loosen T-bolts (4 and 5). Tilt lower section of towbar assembly (6) away from storage
bracket and remove upper section (3). Set aside for future use.
4. Loosen T-bolts (7 and 8) and remove lower section (6). Set aside for future use.
5. Loosen all four T-bolts on inner towbar assembly and slide to outer position. Tighten
T-bolts (7 and 8).
6. Repeat steps 2 through 4 for remaining towbar assembly.
NOTE
Both the upper and lower sections are offset to allow for variations in the
distance between the towing eyes on the towed vehicle.
Refer to WP 0089 for correct pin size and pin location.
7. Position lower section (6) onto boom and line up center hole (9) with the second
hole from mast. Do not tighten lower section T-bolts.
8. Install upper section (3) into lower section (6).
9. Repeat steps 7 and 8 for remaining tow bar assembly.
10. Estimate position of tire stop assembly (10) so front tires of towed vehicle meet the tire stop assembly
and the tow bar assemblies are not moved beyond the fourth hole (11) from the mast.
Figure 42. Tow Bar Assembly Preparation
END OF WORK PACKAGE
0009 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us