Click here to make tpub.com your Home Page

Page Title: Figure 25. Hydraulic Controls and Clevis
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 24.Hydraulic Controls and Electric Control Box
Up
TM-9-2510-247-13-P Fifth Wheel Towing Device Model 250M (NSN 2510-01-458-8253) Manual
Next
Figure 27. Pin Alignment and Valve

TM 9-2510-247-13&P
0007 00
TRANSPORT CONFIGURATION - Continued
WARNING
Ensure the boom has sufficient overhead clearance prior to folding the boom
into a vertical position. Failure to comply may result in injury or death to personnel.
4. Using remote control box or valve control levers, BOOM RETRACT (9) to raise boom to a
closed vertical position.
13
9
11
12
10
Figure 25. Hydraulic Controls and Clevis
5. Remove two clevises (10), clevis pins (11), and spring pins (12) from mast assembly (13).
6. Using remote control box or valve control levers, MAST EXTEND (14) to line up
arrows (15 and 16).
17
15
14
16
Figure 26. Remote Control and Pin Alignment
0007 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us