Click here to make tpub.com your Home Page

Page Title: Figure 2-24. Reid Vapor Pressure Bomb Bath (Sheet 2 of 2)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-24. Reid Vapor Pressure Bomb Bath (Sheet 1 of 2)
Up
TM-5-6640-212-14 Mobile Semitrailer-Mounted Petroleum Laboratory (NSN 6640-00-538-2736) Manual
Next
Figure 2-25. Manometer

TM 5-6640-212-14
Figure 2-24. Reid Vapor Pressure Bomb Bath (Sheet 2 of 2)
(4) Apply power to the unit. This will energize the
b. Operation.
heater and stirrer motor circuit. Turn on the stirrer motor.
CAUTION
WARNING
Never turn on the toggle switch
Exercise extreme care not to exceed
unless bath is filled with water.
this proportion, as 12 parts per
Heaters will burn out if they are not
million  (0.012  ml/liter)  of  copper
immersed.
sulfate is poisonous.
(1) Fill the bath to level of the overflow standpipe
(5) Pilot light will light while the heater is on.
with water to which has been added 10 parts per million
When the temperature attains 100 degrees F (38
(0.01 ml/liter) of copper sulfate to cut down the growth of
degrees C), the thermoregulator will shut down the
algae.
heater and the light will extinguish.
(2) Check and calibrate the thermoregulator (para
(6) To drain the bath, unscrew the standpipe by
3-18d).
turning the handle (rod through pipe) counterclockwise.
(3) Install the thermoregulator in the bath.
Lift out the pipe and the water will drain out.
2-44

Privacy Statement - Press Release - Copyright Information. - Contact Us