Back Figure 2-11. Gum Bath, Low and High Pressure Steam Setup (Sheet 3 of 5) | Up TM-5-6640-212-14 Mobile Semitrailer-Mounted Petroleum Laboratory (NSN 6640-00-538-2736) Manual | Next Figure 2-11. Gum Bath, Low and High Pressure Steam Setup (Sheet 5 of 5) |