Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. INSPECTION PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
MARKINGS ON CAMOUFLAGED EQUIPMENT
Up
TM-43-0139 Painting Instructions for Army Material Manual
Next
LEVEL I INSPECTION

TM 43-0139 Figure 4-2.  Markings on Camouflaged Equipment. Section III.  INSPECTION PROCEDURES 4-10.  GENERAL The full CPP inspection consists of three levels of inspection: Level I, Level II, and Level III.  Level I is essentially a visual conformance check from 50 feet or more.  Level II is a close-up boundary inspection using a CPP overspray gauge.  Level III is a detailed comparison of actual physical measurements to nominal dimensions. 4-11.  MATERIALS/TOOLS REQUIRED After  becoming  completely  familiar  with  the  inspection  procedures  outlined  below,  the  inspector  should  assemble  the following materials/tools: ·     CPP designs, including inspection worksheet (para 4-3) and overspray gauge (fig 4-3) ·     One (1) 6-foot steel measuring tape, graduated in sixteenths (or thirty-seconds) of an inch ·     One (1) 6-foot steel measuring tape, graduated in tenths of an inch ·     Small T-square and/or straight edge ·     Soapstone or chalk ·     Pen, pencils, colored pencils ·     Paper/notebook ·     One plumb bob, with string 4-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing