Click here to make tpub.com your Home Page

Page Title: TESTING ENGINE ONLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
REMOVE-continued
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
INSTALL-continued
TB 9-2350-368-25
TESTING ENGINE ONLY
DESCRIPTION
This task covers: Install (page 4-21). Start (page 4-23). Shutoff (page 4-24). Remove (page 4-24).
INITIAL SETUP
Tools:
General Mechanic's Tool Kit
Engine Sling
Turbocharger Inlet Shield 4910-01-127-7959
Materials/Parts:
Grease
Locknuts (2)
Personnel Required:
Unit Mechanic
Helper
References:
LO 9-2350-247-12
LO 9-2350-261-12
LO 9-2350-277-12
TM 9-2350-247-20-1
TM 9-2350-261-20-1
TM 9-2350-277-20-1
TM 9-2350-366 Series
TM 9-2815-205-34
TM 38-260
Equipment Conditions:
Engine on maintenance stand or blocks
Powerplant test stand blocked
INSTALL
WARNING
·
Damaged lifting slings can fail with load. Personnel can be killed
or injured. Inspect all slings before use. Do not use damaged
slings.
·
Hanging loads can kill or injure you. Keep away from hanging
loads and overhead equipment. Keep hands out of area while
engine is being lifted for removal or lowered for installation.
NOTE
·
OSV has A3 engine and TX200-4/4A transmission.
·
If testing OSV, refer to TM 9-2350-366 series.
1. Attach engine sling to lifting brackets and lift engine. Have helper assist.
2. Attach appropriate engine sling to lifting device of at least 2,000 pounds (908 kg) capacity.

Privacy Statement - Press Release - Copyright Information. - Contact Us