Click here to make tpub.com your Home Page

Page Title: Figure 4-6. Hook-Up List (M113A3/M548A3)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-5. Ground Bolt
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
START

TB 9-2350-368-25
17. Install right brake connecting links, two screws, lockwashers, and flat washers on right transmission
brake. See Figure 4-6.
CAUTION
Do not use screws removed from transmission. Damage
of screws may damage transmission.
18. Remove two screws from the right side of transmission. Save transmission screws. Install brake stall
test tool (Figure 2-28), secure with two screws. Connect brake stall test tool to braking hardware. Use
rod-end clevis and rod-end connector. Connect rigid connecting link between two 1/4 inch steel plates
and secure with headed pin, washer, and cotter pin. See Figure 4-6.
19. Fill engine and transmission with oil. Refer to LO 9-2350-277-12 (M113A3 FOV) or LO 9-2350-247-12
(M548A3).
Figure 4-6. Hook-Up List (M113A3/M548A3)

Privacy Statement - Press Release - Copyright Information. - Contact Us