Click here to make tpub.com your Home Page

Page Title: Figure 4-5. Ground Bolt
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-4. Placement of Turbocharger Inlet Shield
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
Figure 4-6. Hook-Up List (M113A3/M548A3)

TB 9-2350-368-25
12. Connect generator ground lead and starter ground lead to ground bolt (15) on front engine mount with
wingnut and lockwasher.
NOTE
Tachometer is not necessary when using STE-ICE. If tachometer is
needed, a hand held tachometer is better suited for making
adjustments. Only the M113A3 FOV powerplant is wired with STE-
ICE transducers and harness connected on the engine.
13. Install tachometer cable on engine tachometer adapter and connect to tachometer.
Figure 4-5. Ground Bolt
14. Connect alternator, accessory, starter, and transmission cables to powerplant test stand cables. Ensure
that connections are for M113A3/M548A3 only.
15. Connect STE/ICE harness to instrument panel/box (M548A3 must connect STE/ICE and transducers to
powerplant) and make connections to engine components, shunt, and batteries. Refer to TM 9-2350-277-
20.
16. Connect engine fuel line quick disconnect halves to powerplant test stand quick disconnect halves.

Privacy Statement - Press Release - Copyright Information. - Contact Us