Page Title: SECTION VII. TEST EQUIPMENT FABRICATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-26. Instrument Panel/Box
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
Figure 2-27. Transmission Stall Test Tool

TB 9-2350-368-25
SECTION VII. TEST EQUIPMENT FABRICATION
TEST EQUIPMENT. The fabricated test tools consist of transmission stall test tool and brake stall
2-7.
test tool. These tools are needed because without the carrier, there is no way to apply the brakes to prevent
the transmission from moving.
a. Transmission Stall Test Tool
Bill Of Materials
Item
Nomenclature
Part Number
NSN
Qty
3/8" Steel Plate
1
6 by 14-1/2 inches (15.2 by 36.8 cm)
1
2
7-5/8 by 14-1/2 inches (19.4 by 36.8 cm)
1
1/2" Steel Plate
3
3 by 5-27/32 inches (7.62 by 14.8 cm)
1
2 1/4" by 2 1/4" Block Steel
4
14-1/4 inches (36.8 cm)
1
Hardware
5
Cap Screw (7C)
B1821BH050F200N
5305-00-719-5238
4
6
Washer (7C)
11678182
5310-00-011-5730
4
7
Cap Screw (6C)
B1821BH037F100N
4
8
Washer (6C)
10910174-33
4
9
Cap Screw
B1821BH044C550N
3
10
Washer
MS27183-60
3
11
Nut
MS51967-11
3
1. Cut one 6- by 14-1/2- by 3/8-inch steel plate (1). Scribe a line 8-1/4 inches from the end of plate (1). Scribe
another line 2-1/4 inches from the first scribe line. See Figure 2-27.
2. Scribe a line 2-1/4 inches from the side of 3/8-inch steel plate (1). See Figure 2-27.
3. Cut 2-1/4-inch square where scribed lines meet on 3/8-inch steel plate (1).
4. Drill a 17/32-inch hole next to the square one inch from the side and six inches from the end of 3/8 inch
steel plate (1).
5. Drill two 17/32 inch holes one inch from the end and one inch from the side of 3/8-inch steel plate (1). See
6. Cut 7-5/8- by 14-1/2- by 3/8-inch steel plate (4). Cut the corners of as shown in Figure 2-27.
7. Weld 3/8-inch steel plates (1) and (4) per Figure 2-27.
8. Make a 3- by 5-27/32-inch plate (2). Drill four holes and round off corners to match the transmission
yoke. See Figure 2-27.
9. Cut 2-1/4 inch by 2-1/4 inch block steel (3) 14-1/4 inch long. See Figure 2-27.
10. Weld 1/2-inch steel plate (2) to end of 2-1/4 inch block steel (3) at the same height as the transmission
yoke.
11. Weld 2-1/4 inch block steel (3) after inserting into square in 3/8-inch steel plate (1).