Click here to make tpub.com your Home Page

Page Title: Figure 2-5. Floor Plate Dimensions and Locations
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-4. Forklift Pockets
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
Front Engine Mount (Common)

TB 9-2350-368-25
11. Cut floor plates (1 through 7) to dimensions shown in Figure 2-5. Tack weld in place as indicated in
Figure 2-4. (Items 13 through 17 on Bill of Materials list). Hard weld, if all items are in proper
alignment, in accordance with welding specification QQ-A-250.
12. Drill four holes in plate (2) for mounting the 100 amp regulator, using voltage regulator/200 amp
regulator face plate (1, Figure 2-12).
13. Test stand base may now be placed on axles and wheels or a skid according to facility requirements.
Figure 2-5. Floor Plate Dimensions and Locations

Privacy Statement - Press Release - Copyright Information. - Contact Us