Click here to make tpub.com your Home Page

Page Title: Figure 2-3. Frame Assembly Supports--Bottom View
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-2. Frame Assembly Dimensions--Top View
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
Figure 2-4. Forklift Pockets

TB 9-2350-368-25
NOTE
Fabrication/installation of all components that go on bottom of stand
may be fabricated/installed while stand is inverted.
5. Flip frame assembly over, locate and weld four 15-inch steel tubes (10) vertically on frame 2-1/2 inches
from each corner. Cut one end at a 45° angle.
6. Position and tack weld two 50-inch 2" by 4" tubes (11) cut on a 45° angle on both ends. One on each end
of stand on vertical tubes.
7. Hard weld if all items are in proper alignment, in accordance with welding specification QQ-A-250.
Figure 2-3. Frame Assembly Supports--Bottom View

Privacy Statement - Press Release - Copyright Information. - Contact Us