Click here to make tpub.com your Home Page

Page Title: Figure 2-1. Frame Assembly Layout--Top View
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
CHAPTER 2. FABRICATION
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
Figure 2-2. Frame Assembly Dimensions--Top View

TB 9-2350-368-25
1. Cut ends of rectangular steel tubes (1, 2) at 45° angle, final length to be 96 inches (243.8 cm) and 50
inches (127.0 cm) respectively. Lay steel tubes on flat level surface in accordance with Figure 2-1. Weld
ends together. (See TM 9-237.)
2. Lay rectangular steel tubes (3, 4, and 5) inside box frame in accordance with art in Figure 2-1 and
dimensions in Figure 2-2. Tack weld all steel tubes together.
3. Align steel angles (6 and 7) within welded framework in accordance with art in Figure 2-1 and
dimensions in Figure 2-2. Tack weld all joints.
4. Hard weld, if all items are in proper place, in accordance with welding specification QQ-A-250.
Figure 2-1. Frame Assembly Layout--Top View

Privacy Statement - Press Release - Copyright Information. - Contact Us