Click here to make tpub.com your Home Page

Page Title: Marking Instructions for M984E1 Crane Boom
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 18. Boom markings (boom extended).
Up
TB-43-0209 Color Marking and Comouflage Painting of Military Vehicles Construction Equipment and Materials Handling Equipment Manual
Next
WEIGHT CLASSIFICATION.

TB 43-0209
Marking Instructions for M984E1 Crane Boom
FORMULA: A+B+C= EXTENDED LENGTH.
NOTE: The mid section and fly section are marked the same.
1. Place the crane in operation condition (TM 9-
5. Measure from the outer edge of the boom
2320-279-10-2).
section mark at 6-inch intervals a vertical strip
2. Raise  boom  to  horizontal  position  with
1/2 inch wide. Mark the first strip 2 inches high
extensions fully extended.
from bottom of section and the second strip 4
3. Measure and mark a 3/4-inch vertical strip along
inches high rotating the 2-inch and the 4-inch
the outer edge of the three boom sections.
strips the complete length of the section.
4. On the base section boom to the right of and
parallel to the 3/4-inch strip mark 7' 2" in two-
6. Above each 4-inch strip, in two inch letters mark
inch letters.
the appropriate feet measurement (1, 2, 3, etc).
Figure 19. Boom Marking Instructions for M984E1.
21

Privacy Statement - Press Release - Copyright Information. - Contact Us