Click here to make tpub.com your Home Page

Page Title: MODIFICATION PROCEDURE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Bulk and Expendable Material
Up
MWO-9-2330-390-35-1 Modification of M1022A1 Dolly Set Positioning Tube Reinforcement Manual
Next
TOP AND BOTTOM BEAM PREPARATION

MWO 9 -2330-390-35-1
9. SPECIAL TOOLS; TOOL KITS; JIGS; TEST, MEASUREMENT, AND
DIAGNOSTIC EQUIPMENT (TMDE); AND FIXTURES REQUIRED.
a. Hand tools and tool kits necessary to apply MWO are listed:
NOMENCLATURE
NSN
CAGEC
SUPPLY CATALOG
Tool Kit, General Mechanic's
5180-00-177-7033
50980
SC 5180-90-N26
Kit, Redundant Power
1730-01-4062585
21439
8D00220-1
Wrench, Twist Lock
21439
8D00136 (Provided w/ Dolly)
Drill Set, Twist
5133-00-293-0983
55719
SC 4910-95-CL-A74
Drill, Electric, Portable
5130-00-293-1849
81348
SC 4910-95-CL-A74
Welder, Short Arc Mig
3431-01-071-9104
30367
P/N SWM-14
b. Tools necessary to apply MWO are contained in the following shop set:
NOMENCLATURE
NSN
CAGEC
SUPPLY CATALOG
Shop Equipment,
4910-00-754-0654
19204
SC 4910-95-A74
Automo tive Maintenance
And Repair
10. MODIFICATION PROCEDURE.
WARNING
Use extreme caution when handling heavy parts. Lifting device is required
when parts weigh over 50 lb (23 kg) for a single person lift, over 100 lb (45
Kg) for a two person lift, and over 150 lbs (68 kg) for a three or more person
lift. Keep clear of heavy parts supported only by lifting device. Failure to
follow this warning may cause serious injury or death to personnel
NOTE
·
Hydraulic lines should be tagged before removal.
·
Positioning cylinder ports should be plugged with masking tape or other
suitable means as lines are disconnected or fittings are removed.
·
A suitable container should be used to catch any draining hydraulic fluid.
Ensure tha t all spills are properly cleaned.
a. DOLLY PREPARATION
NOTE
·
Preparation procedures are the same for front and rear dollies.
1. Uncouple Dolly set from Tow vehicle
2. From the transport or travel mode (Figure 2) perform operations needed to
detach front and rear dollies (Refer to Appendix A).
5

Privacy Statement - Press Release - Copyright Information. - Contact Us