Click here to make tpub.com your Home Page

Page Title: Removing Dolly Half From Maneuvering Position.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Placing Dolly Half in Maneuvering Position-continued
Up
MWO-9-2330-390-25-1 Modification of M1022A1 Dolly Set Positioning Tube Reinforcement Manual
Next
APPENDIX C. TOP AND BOTTOM BEAM AND HYDRAULIC LIFT CYLINDER REMOVAL / INSTALLATION

MWO 9-2330-390-25-1
APPENDIX B. MANEUVERING POSITION (Con't).
b. Removing Dolly Half From Maneuvering Position.
CAUTION
·
Use extreme caution to ensure that near (left side) top beam vertical tube does not
contact control valve an d fittings an cause damage when removing dolly half from
maneuvering position. Carefully follow all steps and monitor position of lift
cylinders and pivoting tray to guard against blinding and interference.
NOTE
·
The following steps are performed at the front and/or rear dolly as required. When
procedure has been completed, bottom beam will be resting on ground with top
and bottom beams vertical.
(1) Push up on two lift cylinder levers (56) to retract lift cylinders (73). Stop when near (left
side) top beam vertical tube (58) reaches within ½ in. (13 mm) of hydraulic control valve
(74) and fittings (90).
(2) Continue to push up on two lift cylinder levers (56), allowing far (right side) lift cylinder
(73) to lead near (left side) lift cylinder. Maintain clearance of ½ in. (13 mm).
(3) Continue to push up on two lift cylinder levers (56) until bottom beam (3) rests on ground.
(4) Quickly push up on positioning cylinders lever (71) to FLOAT position.
(5) Push up on lift cylinder levers (56) to retract lift cylinders (73) until approximately 6 in.
(15 cm) of stroke remain on lift cylinders.
(6) Return positioning cylinders lever (71) to NEUTRAL position.
(7) Push up on positioning cylinders lever (71) until top and bottom beams (1 and 3) are vertical.
B-3

Privacy Statement - Press Release - Copyright Information. - Contact Us