Click here to make tpub.com your Home Page

Page Title: INSTRUCTIONS FOR BRAKE (BENDIX) MODIFICATION OF SEMITRAILER, LOWBED; 40-TON CONSTRUCTION EQUIPMENT TRANSPORTER M870 (CCE)
Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Up
MWO-5-2330-360-23-1 Instructlions for Brake (BENDIX) Modification Manual
Next
TECHNICAL PUBLICATIONS AFFECTED/CHANGED.

URGENT
MWO effective date 1 February 1994 and completion date 31 December 1994
MWO 5-2330-360-23-1
MODIFICATION WORK ORDER
INSTRUCTIONS FOR BRAKE (BENDIX) MODIFICATION
OF
SEMITRAILER, LOWBED; 40-TON
CONSTRUCTION EQUIPMENT TRANSPORTER M870 (CCE)
(CMI/LOAD KING MODEL 403LF)
(NSN 2330-00-133-1731)
AND
SEMITRAILER, LOWBED: 40-TON
CONSTRUCTION EQUIPMENT TRANSPORTER M870A1
(NSN 2330-01-224-9245)
HEADQUARTERS, DEPARTMENT OF THE ARMY, WASHINGTON, D.C.
1 Februaryl994
1. PURPOSE. The purpose of this MWO is to provide kit data, parts information and modification instructions for brake
(bendix) modification of Semitrailer, Lowbed: 40-Ton Construction Equipment Transporter M870 (CCE) (CMI/Load King
Model 403LF), (NSN 2330-00-133-1731) and Semitrailer, Lowbed: 40-Ton Construction Equipment Transporter M870A1,
(NSN 2330-01-224-9245)
2. PRIORITY. This modification is classified as URGENT.
3. END ITEM TO BE MODIFIED.
SEMITRAILER, Lowbed: 40-Ton Construction Equipment Transporter, M870 (NSN 2330-00-133-1731), LIN S70594.
(The M870 modification is covered in paragraph 10, part one.)
SEMITRAILER, Lowbed: 40-Ton Construction Equipment Transporter, M870A1, (NSN 2330-01-224-9245), LIN S70594.
(The M870A1 modification is covered in paragraph 10, part two.)
4. MODULES TO BE MODIFIED None.
5. PARTS TO BE MODIFIED.
The two trailer models brake systems will be modified to include a new (third) rear air reservoir tank, new relay valves,
together with some new associated air lines and fittings, and replacement of existing slack adjusters with new automatic
slack adjusters.
6. APPLICATION.
a. Time Compliance Schedule. 1 February 1994 through 31 December 1994.
b. Level of Maintenance. Unit and Direct Support maintenance levels.
c.  Work Force Skills. Unit and Direct Support general chassis mechanic.
Approved for public release; distribution is unlimited.

Privacy Statement - Press Release - Copyright Information. - Contact Us