Figure 6-23. Rail Anchors
(4) Rail anchors will not be used across open deck bridges. Instead, for two rail lengths off each end
of the bridge, every third tie should be box anchored. A similar arrangement should be used at rail
crossings, as shown in figure 6-24. Rail anchors should be applied at the normal designated pattern
across ballast deck bridges.
6-39
|
|