| ||||||||||
|
|
![]() ![]() CEMP-E
TI 850-02
AFMAN 32-1125(I)
1 MARCH 2000
6. TRACK DESIGN METHODS.
6-13
7. AREMA DESIGN PROCEDURE (1995- MODIFIED).
6-13
8. SUBGRADE.
6-20
9. FROST DESIGN MODIFICATIONS.
6-20
10. DRAINAGE.
6-24
11. GEOTEXTILES.
6-26
12. BALLAST.
6-27
13. SUB-BALLAST.
6-28
14. TIES AND TIE SPACING.
6-29
15. RAIL.
6-32
16. OTHER TRACK MATERIAL.
6-35
17. TURNOUTS AND CROSSOVERS.
6-40
18. TRACK CONNECTIONS AND LADDER TRACKS.
6-47
19. RAIL CROSSINGS.
6-50
20. MISCELLANEOUS TRACK APPLIANCES.
6-51
7-1
1. ROAD CROSSINGS.
7-1
2. BRIDGES.
7-22
8-1
1. INTRODUCTION.
8-1
2. SITING AND GENERAL LAYOUT.
8-1
3. TRACK DESIGN.
8-1
4. CLEARANCES AND USABLE TRACK LENGTH.
8-3
5. VEHICLE TERMINALS.
8-3
6. BREAK BULK (SMALL CARGO) TERMINALS.
8-7
iii
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |