Click here to make tpub.com your Home Page

Page Title: Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 5-5. Rope Guide Assembly Lubrication Chart
Up
TM-32-5985-343-14-P Antenna Tower TS-1A Manual
Next
Table 5-4. Organizational Preventive Maintenance Checks and Services

TM 32-5985-343-14&P
Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
5-6.  PMCS PROCEDURES.  To be sure that the
a. Desert Climates. Check frequently for problems
Antenna Tower TS-1A is fully operational at all times, it
created by large amounts of sand, dust, and dirt. One of
must be inspected periodically and systematically.
these problems is damage to moving parts from grit
Defects can then be discovered and corrected before
produced when sand, dust, and dirt mix with lubricants.
they result in serious damage to the tower or antenna.
Necessary preventive maintenance checks and services
b. Tropical  Climates.
Check  frequently  for
are listed in table 5-4. Take the tower out of service
problems produced by moisture, such as condensation
immediately if a deficiency is noted that would endanger
on equipment and accelerated corrosion.
the structure or would damage the equipment. Record
all deficiencies and corrective actions on forms and
records specified in TM 38-750.
5-7. SPECIAL INSTRUCTIONS. Some environments
require more preventive maintenance checks and
services than those given in paragraph 5-6.
5-8

Privacy Statement - Press Release - Copyright Information. - Contact Us