| ||||||||||
|
|
![]() ![]() TM 32-5985-343-14&P
CAUTION
When installing scaffold winch assembly, make sure that crank axis is parallel to tower face A.
The winch will then be able to move the antenna carriage when it rides on the horizontal tracks
on the tower adapter. (Page 2-20)
CAUTION
Before tower is completely erect, check alignment of studs in tower support with mating holes in
tower leg that comes down. If holes and studs do not align, correct the alignment. Otherwise
damage to tower leg or tower support will result. (Page 2-23)
WARNING
Never use elevator erection sling to raise structural member when sling is supporting member by
frictional contact only. Sling must go through hole or be safely secured over welded track tabs
when lifting track or brace. Elevator hoist operator must stand inside tower while operating
hoist, to avoid being under members being raised. (Page 2-29)
CAUTION
Before beginning to raise or lower loads, always operate controls momentarily to eliminate all
slack in cable. Otherwise starting can cause shock load, which can cause damage to hoist or
rigging. (Page 2-29)
WARNING
Persons must never try to ride elevator. It does not have safety features required for carrying
persons. (Page 2-32)
CAUTION
Before raising or lowering load with elevator hoist, always operate controls momentarily to
eliminate all slack in cable. This way shock load and resulting damages to hoist or rigging are
avoided. (Page 2-32)
WARNING
Do not let elevator assembly go beyond its upper limit of travel. Take extreme care when it
approaches this position. Otherwise excessive cable stress could result, and this stress could
cause equipment failure or injury to persons. (Pages 2-32, 5-13)
vii
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |