Click here to make tpub.com your Home Page

Page Title: SAFETY SUMMARY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
LIST OF TABLES
Up
TM-32-5985-343-14-P Antenna Tower TS-1A Manual
Next
WARNING

TM 32-5985-343-14&P
SAFETY SUMMARY
The following are general safety precautions that are not related to any specific procedures and therefore do not
appear elsewhere in this publication. These are recommended precautions that personnel must understand and apply
during many phases of operation and maintenance.
KEEP AWAY FROM LIVE CIRCUITS
Operating personnel must at all times observe all safety regulations. Do not replace components or make
adjustments inside the equipment with the voltage supply turned on. To avoid casualties, always remove power and
ground a circuit before touching it.
DO NOT SERVICE OR ADJUST ALONE
Under no circumstances should any person reach into or enter the enclosure for the purpose of servicing or
adjusting the equipment except in the presence of someone who is capable of rendering aid.
RESUSCITATION
Personnel working with or near high voltages should be familiar with modern methods of resuscitation.
The following warnings and cautions appear in the text of this manual and are repeated here for emphasis.
CAUTION
Prepare a fine grain surface on top of piers. Allow minimum of 28 days for the concrete to cure
before erecting tower. Otherwise piers will not adequately support tower and hoist. (Page 2-10)
CAUTION
Be sure that right and left tower pivots are not 1800 out of alignment.
Otherwise pivot
assemblies may be damaged when the tower section is raised. (Page 2-11)
WARNING
When working on structural tower, use safety climbing belts and pass tools and materials by
using appropriate containers or ropes. (Page 2-11)
WARNING
Truck winch and hoist cables used for raising assemblies and restraining the tower during
erection must have a minimum workload rating of 1 ton. The winch truck must be capable of
effectively braking, lowering, and safely holding this I-ton load. (Page 2-14)
v

Privacy Statement - Press Release - Copyright Information. - Contact Us