Table 5-4. Organizational Preventive Maintenance Checks and Services - Continued
D - Daily
M - Monthly
S - Semiannually
B - Biennially
W - Weekly
Q - Quarterly
A - Annually
H - Hours
ITEM
INTERVAL
Item to be
Procedures
Equipment will be reported
NO
DWMQSA
B
H
inspected
Not Ready (Red) if:
7
·
ERECTION
Check for corrosion. Remove corrosion.
Erection fixture is corroded
FIXTURE
Clean and apply zinc-chromate paint (para. 5-3).
beyond repair.
8
·
CABLE HOIST
a. Check line for corrosion or damage. Clean
Cable hoist is corroded
beyond repair.
b. Check for damaged or loose hardware.
Hardware is damaged and
Replace damaged hardware or tighten, as
replacement is unavailable.
necessary.
9
·
DYNAMOMETER
a. Stow in storage case when not in use.
b. Lightly oil to prevent seizing.
Dynamometer seizes even
after oiling.
c. If dropped or damaged, repair and/or
Dynamometer cannot be re
calibrate at local calibration facility.
paired or calibrated.
10
·
ELEVATOR
a. Check for seizing or damaged bearings.
Seizing cannot be corrected;
ASSEMBLY
Lubricate (figure 5-2) or replace damaged
damaged bearings cannot
bearings, as necessary.
be replaced.
b. Check alignment of 7/16-inch diameter
Alignment cannot be
holes with carriage assembly. Position
achieved.
track as necessary.
11
·
CARRIAGE
a. Check carriage assembly for damage or
Carriage assembly is damaged
ASSEMBLY
corrosion. Replace damaged parts or clean
beyond repair.
and paint (para. 5-3) corroded parts.
b. Lubricate cam followers (figure 5-2).
Lubricant is unavailable.