Click here to make tpub.com your Home Page

Page Title: Figure 5-5. Cable Hoist Lubrication Chart
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 5-4. Tower Erection Kit Lubrication Chart
Up
TM-32-5985-342-14-P Antenna Tower TS-9A Manual
Next
Table 5-4. Organizational Preventive Maintenance Checks and Services

TM 32-5985-342-14&P
Figure 5-5. Cable Hoist Lubrication Chart
Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
all deficiencies together with the corrective action taken
5-6 GENERAL.  The Antenna Tower TS-9A must be
on forms and records specified in TM 38-750.
systematically inspected to ensure it is always ready for
operation.  Defects discovered during inspections can
5-7 PREVENTIVE MAINTENANCE PROCEDURES.
then be corrected before serious damage or failure
results. The necessary preventive maintenance checks
Table 5-4 lists procedures for the performance of
and services to be performed are listed in table 5-4.
maintenance inspections and services.
The table
The item numbers indicate the sequence of minimum
provides the sequence of, and time intervals for,
inspection requirements.  Defects discovered during
maintenance actions which are the responsibility of
operation of the unit will be noted for future corrections
organizational level personnel. Refer any trouble that is
to be made as soon as operation has ceased.  Stop
beyond the scope of organizational maintenance to the
operation immediately if a deficiency is noted during
direct support maintenance level.
operation which would damage the equipment. Record
5-7

Privacy Statement - Press Release - Copyright Information. - Contact Us