Click here to make tpub.com your Home Page

Page Title: TOWER GROUNDING, AVIATION LIGHTING, AND CONVENIENCE OUTLET KITS INSTALLATION.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-11. Elevator Assembly
Up
TM-32-5985-342-14-P Antenna Tower TS-9A Manual
Next
Figure 2-12 Tower Grounding Kit Installation

TM 32-5985-342-14&P
2-13 TOWER GROUNDING, AVIATION LIGHTING,
(3) Remove one step and hex nut from lower
AND CONVENIENCE OUTLET KITS INSTALLATION.
tower leg. Install control mount plate (7) to lower tower
leg. Secure with step and hex nut.
The tower grounding, aviation lighting, and convenience
(4) Install lighting control panel (12) to control
kits  are  installed  after  the  tower  is  completely
mount plate (7). Secure with four 5/16-inch bolts (10),
assembled. The aviation lights and convenience outlets
lockwashers (9), and hex nuts (8).
require a 120-Vac, 50/60-Hz primary power source.
(5) Connect three conductor cables (14) and
Installation procedures are as follows:
two water tight connectors (11) between junction box
(15) and lighting control panel (12).
a. Tower Grounding Kit Installation. Refer to figure
c. Convenience Outlet Installation. Refer to figure
(1) Dig two holes on opposite comers of the
tower about 12 inches deep.
(1) Remove one step from tower leg at top of
(2) Place ground rod (4) into bottom of one
tower.
hole. Drive ground rod into the ground until top of rod is
(2) Install convenience outlet mount plate (1)
about 6 inches below ground level.
to tower leg. Secure with tower step and hex nut.
(3) Install ground wire assembly (2) to ground
(3) Install one convenience outlet (2) to
rod (4). Secure with ground rod clamp (3).
convenience outlet mount plate (1). Secure with a 1/4-
(4) Remove one locknut (6) and hex nut (5)
inch bolt (3), lockwasher (4), and hex nut (5).
from stud (7).
(4) Remove one step from tower leg about 5
(5) Install ground wire assembly (2) and flat
feet above ground level.
washer (1) onto stud (7). Secure with hex nut (5) and
(5) Install junction box mount plate (6) to
locknut (6).
tower leg. Secure with tower step and hex nut.
(6) Repeat steps (2) through (5) to install
(6) Install junction box assembly (7) to
other grounding rod.
junction box mount plate (6). Secure with four 1/4-inch
bolts (3), lockwashers (4), and hex nuts (5).
b. Aviation Lighting Kit Installation. Refer to figure
(7) Install second convenience outlet (2) to
bracket (8) on junction box mount plate (6). Secure with
(1) Install junction box (15) to top tower
1/4-inch bolt (3), lockwasher (4), and hex nut (5).
brace.  Be sure drain hole faces down.  Secure with
hardware provided.
2-14 INTERCONNECTIONS. After the tower has been
(2) Install two dual obstruction lights (2), four
completely assembled, connect the aviation lights,
lamps (1), rigid conduit (5), fitting (6), union (13), and
convenience outlets, and electric hoist to primary power
four locknuts (3). Use wraplock kit (4) to secure conduit
in accordance with the tower interconnection diagram
(5).
Section IV. PRELIMINARY ADJUSTMENT OF EQUIPMENT
(No preliminary adjustment of the Antenna Tower TS-9A is required.)
Section V. INSTALLATION AND CIRCUIT LINEUP
(No installation or circuit lineup of the Antenna Tower TS-9A is required.)