Click here to make tpub.com your Home Page

Page Title: Figure 2-6. 80-Foot Tower Erection, Sheet 18 of 18.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-6. 80-Foot Tower Erection. Sheet 17 of 18.
Up
TM-32-5985-200-15 Antenna System QRC-280 (A) Manual
Next
DISASSEMBLY OF TOWER

CE-1008
Figure 2-6. 80-Foot Tower Erection, Sheet 18 of 18.
A. Relocate the grip-strut platforms from the outboard supports to the inside of the tower.
B. Remove the outboard supports and the box-lifting davits.
C. Install two horizontal cable braces in each tower section except top section and base section (see detail D on figure
2-4, sheet 4).
D. Use erection platforms as shown in figure 2-6, sheet 10.
E. Inflate the radome.
F. Install maintenance hoist.
G. Install grounding system at base of the tower as shown in detail C on figure 2-4, sheet 3.
2-38

Privacy Statement - Press Release - Copyright Information. - Contact Us