Click here to make tpub.com your Home Page

Page Title: 80-FOOT TOWER ERECTION PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ANTENNA PEDESTAL LEVELING PROCEDURES
Up
TM-32-5985-200-15 Antenna System QRC-280 (A) Manual
Next
Figure 2-4. 80-Foot Tower Assembly, Sheet 1 of 7

CE- 1008
NOTE
Servo gain and tach feedback are interactive controls. Many adjustment settings will work, but
there is only one optimum setting, which can be found only after experimentation in the above
mentioned manner.
(12)
Boresighting - Complete boresighting procedure as described in paragraph 9 of this section.
7. 80-FOOT TOWER ERECTION PROCEDURES
A. ASSEMBLED TOWER - The assembled 80-foot tower is shown in Figure 2-4.
Table 5-10 identifies the
component parts of the 80-foot tower.
B. ERECTION EQUIPMENT - An erection davit, platform, and associated tackle is required for erection of the 80-
foot tower. This equipment is illustrated in Figure 2-5 and listed in Table 2-1.
TABLE 2-1. 80-FOOT TOWER ERECTION EQUIPMENT
Qty
Part NO.
Description
Required
L-1686-20
Erection Davit
1
L-1686-21
Hoist Line, 380-Foot
1
L-1686-22
Erection Platform
2
2123
Tag Line, 140-Foot
2
651
Ratchet Wrench With Socket
2
2150
Tensiometer
4
2163
Tensiometer Case
4
2234
Digging Bar
1
C. ERECTION PROCEDURE - Refer to Figure 2-6, sheets 1 through 18, for detailed illustrated procedures for
erection of the 80-foot tower.
2-12

Privacy Statement - Press Release - Copyright Information. - Contact Us