Click here to make tpub.com your Home Page

Page Title: Chapter 5. SHIPMENT AND LIMITED STORAGE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Replacement of Knobs,
Up
TM-11-6625-1702-12 Test Set Antenna AN/ARM-115 Manual
Next
Appendix A. REFERENCES

TM 11-6625-1702-12
SHIPMENT AND LIMITED STORAGE
ment as shown in figure 2-1. For stock num-
5-1. Disassembly of Equipment
bers of materials, refer to SB 38-100.
Prepare the equipment for shipment and stor-
Dimensions (in. )
age as follows:
Material
Qty
Length Width
Height
a. Disconnect all the test equipment, the
Polystyrene corner 8
5
5
5
3
blocks (bearing
3
3
u n i t under test, and all the cables from the
surf ace ).
TS-2642/ARM-l15.
22½
1
29½
11½
Water-resistant,
corrugated,
b. Place the cables in the cover, and the
double-wall,
radome in the test set case.
fiberboard box
168
1
1
Pressure-sensitive
c. S e t  t h e  T S - 2 6 4 2 / A R M - l 1 5  M E T E R
f i l a m e n t tape
FUNCTION switch to OFF. In the OFF posi-
PPP-T-97 type 4.
t i o n , the switch shorts the meter movement
216
3
Pressure-sensitive,
1
which provides damping and prevents possible
water-resistant
d a m a g e from physical shock. Set the MAN-
tape PPP-T-76.
4 units
D e s i c c a n t (1 bag)
UAL TUNE switch to OFF.
Nets. The dimensions shown for the box are inside dimensions.
d. If the TS-2642/ARM-l15 is not within
b . Packaging. Package the antenna test set
the test set case, install the TS-2642/ARM-l15
as outlined below.
in the test set case and tighten the fasteners.
(1) Place four units of desiccant in
e. Replace and fasten the test set cover.
c a r r y i n g case.
(2) Place one polystyrene corner block in
5-2. Repackaging for Shipment or
each of the four bottom corners of the fiber-
limited Storage
board box.
T h e exact procedure for repackaging depends
( 3 ) Place the AN/ARM-115 in the fiber-
upon the material available and the conditions
board box; position it on the four corner
under which the equipment is to be stored or
blocks.
shipped. Adapt the procedures outlined below
w h e n e v e r circumstances permit. The informa-
(4) Place one polystyrene corner block in
t i o n concerning the original packaging (para
e a c h of the four upper corners of the fiber-
2-1 ) will also be helpful.
b o a r d box.
a. Material Requirements. T h e f o l l o w i n g
(5) Secure the fiberboard box with pres-
sure-sensitive tape as shown in figure 2-1.
materials are required for packaging the equip-
Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us