Click here to make tpub.com your Home Page

Page Title: Table 4-2. Organizational Troubleshooting - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 4-2. Organizational Troubleshooting - Continued
Up
TM-11-5985-371-12-P Antenna AS-3577/GRC (NSN 5985-01-148-1778) Manual
Next
Table 4-2. Organizational Troubleshooting - Continued

TM 11-5985-371-12&P
Table 4-2. Organizational Troubleshooting - Continued
Malfunction
Test or Inspection
Corrective Action
Use the multimeter to measure the resistance between the two antenna
Step 5.
on the balun and the
wires
removed from one antenna connector
not removed) from the other connector
of the
two antenna wires
balun.  Normal reading is 600 ohms.
If normal, go to step 6.
If abnormal, go to step 7.
Check for continuity of each of the two antenna wires
. That is,
Step 5.
use the multimeter to check for continuity (less than 1 ohm) between
the two ends of the antenna wire removed from one antenna connector
Repeat the measurement for the antenna wires connected to the
q
other connector
, after disconnecting the wires.
If normal, reconnect the rf cable and antenna wires.
If abnormal, replace both antenna wires (para 4-16).
4-14

Privacy Statement - Press Release - Copyright Information. - Contact Us