| ||||||||||
|
|
![]() ![]() TM 11-5985-371-12&P
Table 4-2. Organizational Troubleshooting - Continued
--
--
.-.--------
Malfunction
Test or Inspection
Corrective Action
--------
.--.
Step 3. Disconnect the antenna wire
from one antenna connector
on the
. Use the multimeter to measure the resistance between the
balun
two antenna connectors
. Reading should be less than 1 ohm.
If normal, go to step 4.
If abnormal, replace the balun (para 4-15).
Use the multimeter to measure the resistance between either antenna
Step 4.
connector
and the outer shell of the rf cable connector
.
Reading should be infinite (open circuit).
If normal, go to step 5.
If abnormal, replace the balun (para 4-15).
4-13
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |